Executive Summary
Built for Certainty. Executed Under Pressure.
TrustEra was engaged to deliver two hardened generator storage facilities designed to support critical municipal operations in one of the most hurricane-exposed regions in the United States.
This project required execution in an environment defined by evolving design conditions, complex permitting, and high-performance structural requirements—all while maintaining forward progress for a public client.
Project Scope
- Ground-up construction of two hurricane-resilient generator storage buildings
Reinforced structural systems:- Cast-in-place concrete foundations
- CMU structural walls
- Elevated concrete roof systems over metal decking
- Full site development, including:
- Drainage and retention infrastructure
- Utility coordination and power readiness
- Installation of specialty components:
- Overhead access systems
- Electrical infrastructure for emergency equipment
- Compliance with:
- Florida Building Code (high-velocity wind zone)
- Municipal and resilience-driven performance standards